> > > > >
TBILISI RAIL HUB
Georgian Railway carried 1.68 million passengers in 2025 on Stadler double-deckers to the sea and night sleepers to Yerevan — and in May 2026 the first passenger train in six years ran from Baku as the Baku–Tbilisi–Kars line opened.
Tbilisi Central sits above the Station Square metro interchange, a Soviet-era tower with platforms stacked over a shopping mall. The flagship run is the Batumi train: modern Stadler KISS double-deckers, daily each way, 5 hours 35 minutes to the Black Sea for 36 lari in second class — load factors past 100% in summer. Below it run the daily Zugdidi (for Svaneti) and Poti services and the slow, scenic Borjomi local. The railway carried 1,678,421 passengers in 2025 — 65% on main routes, 35% suburban — at an average load factor of 64%; tickets brought ₾31.3 million against ₾56.4 million of costs, a gap the state covers under a public-service obligation.
The international map reopened this year. The Yerevan sleeper runs every second day — Tbilisi 20:20, Yerevan 06:55, re-equipped in 2021 with card-key compartments and shower cars — extended in summer to Batumi. In May 2026 the first passenger train in six years ran from Baku, and the Baku–Tbilisi–Kars corridor was formally inaugurated at Akhalkalaki: new Swiss-built ten-car sleeper trains with a dining car, gauge-changing at the border, design capacity of one million passengers and 6.5 million tonnes of freight a year. The through train to Kars — and one day a rail seat from Tbilisi to Istanbul — is the next domino.
THE TIO READ
Book the Batumi double-decker on tkt.ge the day sales open (20 days out); in July it sells through. Take the Yerevan sleeper over any marshrutka — a bed beats six hours of border queue. When the Baku–Kars through service starts, Tbilisi becomes the Caucasus rail junction again.
Subscribe to the digest and receive key market signals every two weeks.